STEEL CONSRUCTION MANUFACTURING
- Consists of Material input control
- Sandblasting and Priming
- Preliminaryconstruction
- Marking and ÇATIM
- Welding
- Non destructive tests
- Paint
- Final control
- Shipment
- Installation stages
Material, welding, paint and shipment control are performed according to procedures and istructions which are documented in ISO 9001:2008
Accordingly with technical specificiations, Sand blasting and priming generaally are performed with grig +shot scraper according to TS EN ISO 8501-1 at Sa 2 1/2 level Epoxy primer preliminary manufacturing lining is performed in surfaces of which surface preparations are made.
Welding operators who are certified according to TS EN 287-1 works in welded manufacturing.
Hiding power, paint thickness, and adhesion (cross cut test) are performed in paint control wprks .
Controls and test in all stages are documneted .
MİSYON
To be a company which is open to continuous development, obeys all ethical and legal rules, and which takes quality products, delivery timely with requested amounts and customer satisfaction and colleague happiness as principle for itself.